翻訳と辞書
Words near each other
・ East Boone Township, Bates County, Missouri
・ East Borden Important Bird Area
・ East Boston
・ East Boston gas surge
・ East Baray
・ East Bardera Mothers and Children's Hospital
・ East Barito languages
・ East Barito Regency
・ East Barkwith
・ East Barkwith railway station
・ East Barming
・ East Barnet
・ East Barnet School
・ East Barnet Urban District
・ East baronets
East Barre Dam
・ East Barre, Vermont
・ East Barsham Manor
・ East Barsham, Norfolk
・ East Baton Rouge Laboratory Academy
・ East Baton Rouge Parish Public Schools
・ East Baton Rouge Parish Sheriff's Office
・ East Baton Rouge Parish, Louisiana
・ East Bay
・ East Bay (Nova Scotia)
・ East Bay (Nunavut)
・ East Bay (Rhode Island)
・ East Bay (San Francisco Bay Area)
・ East Bay (Santa Rosa County, Florida)
・ East Bay (Texas)


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

East Barre Dam : ウィキペディア英語版
East Barre Dam
East Barre Dam (National ID # VT00053) is a dam in East Barre, Washington County, Vermont.
The earthen dam was constructed between 1933 and 1935 under the supervision of the North Atlantic Division of the United States Army Corps of Engineers, with a height of 65 feet and a length of 1460 feet at its crest.〔http://www.nae.usace.army.mil/water/topic.asp?mytopic=eastbarre〕 The dam is a seasonal flood control structure to impound the Jail Branch River, a tributary of the Winooski River. Construction was done almost entirely with hand labor by the Civilian Conservation Corps.〔http://www.vtstateparks.com/htm/ccc.htm〕
The Corps of Engineers designed the dam in response to a 1927 flood, which set state records and hit the Winooski River Valley and its tributaries the hardest. Eighty-four people died as a result of the flood statewide, and the downtown of Barre, Vermont was decimated.〔http://www.vermonttoday.com/century/topstories/flood.html〕 Today, the dam protects the city from flooding almost yearly, as the area above the dam floods semi-yearly, but the controlled flow of water into Barre cuts back considerably on the amount of flood damage.
The dam is owned and operated by the state of Vermont.〔http://ce-npdp-serv2.stanford.edu/DamDirectory/DamDetail.jsp?npdp_id=VT00053〕 Although the dammed area has a maximum capacity of 23,550 acre-feet, it is normally empty.〔http://www.nae.usace.army.mil/water/topic.asp?mytopic=eastbarre〕
== References ==



抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「East Barre Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.